2011

January -- 2010 Wetland Mitigation Site Monitoring Report

  • Appendix Ia -- Wetland Monitoring Data for Mitigation Sites
  • Appendix Ib -- Wet Meadow Expansion Mitigation Site (WM-2) Monitoring Data
  • Appendix Ic -- Douglas Co. Backwash Drain Line Mitigation Site (WM-3) Monitoring Data
  • Appendix Id -- Water Treatment Plant Mitigation Site WM-4 Monitoring Data
  • Appendix Ie -- Water Treatment Plant Mitigation Site WM-5 Monitoring Data
  • Appendix If -- Water Treatment Plant Mitigation Site WM-6 Monitoring Data
  • Appendix Ig -- Water Treatment Plant Mitigation Site WM-7 Monitoring Data
  • Appendix Ih -- Water Treatment Plant Mitigation Site WM-8 Monitoring Data
  • Appendix Ii -- Water Treatment Plant Mitigation Site WM-9 Monitoring Data
  • Appendix Ij -- Water Treatment Plant Mitigation Site Stream Mitigation Monitoring Data
  • Appendix II -- Hydrological Data
  • Appendix III -- Maintenance Memorandums

January -- 2010 Wetland Monitoring Report

January -- 2010 Bathymetric Monitoring Report

June -- 2010 Annual NOP Groundwater Report

2010

January -- 2009 Wetland Mitigation Site Monitoring Report

Appendix I -- Wetland Monitoring Data for Mitigation Sites

January -- 2009 Wetland Monitoring Report

January -- 2009 Bathymetric Monitoring Report

April -- 2009 Annual NOP Groundwater Report

2009

January -- 2008 Annual Wetland Mitigation Site Monitoring Report

January -- 2008 Wetland Monitoring Report

January -- 2008 Bathymetric Monitoring Report

January 8 -- U.S. Corps of Engineers Construction Report

March 13 -- 2008 Annual NOP Groundwater Report

2008

January 11 -- Construction Report

January 11 -- Quarterly Report to the Lower Platte NRD

January 11 -- 2007 Groundwater Monitoring Report

January 15 -- 2007 Bathymetric Monitoring Report

January 15 -- 2007 Wetland Mitigation Site Monitoring Report

January 15 -- 2007 Wetland Monitoring Report

April 4 -- Quarterly Report to the Lower Platte North NRD

July 11 -- Construction Report

October 3 -- Quarterly Report to the Lower Platte North NRD

October 10 -- Wellfield Contingency Plan

2007

January 9 -- Final Wetland Mitigation Site Selection Study

January 10 -- Annual Groundwater Monitoring Report

January 11 -- Quarterly Report to the Lower Platte North NRD

January 30 -- Construction Report

March -- 2006 Bathymetric Monitoring Report

Appendix I -- 2006 Douglas County Bathymetric Monitoring Data by Pond (figures, photographs, data sheets)

Appendix II -- 2006 Saunders County Bathymetric Monitoring Data by Pond (figures, photographs, data sheets)

Appendix III -- Hydrological Data

March -- 2006 Wetland Mitigation Site Monitoring Report

March -- 2006 Wetland Monitoring Report

Appendix I -- Wetland Monitoring Data for the Douglas and Saunders Counties Wellfields

Wetland 68

Wetland 25

Wetland 100

Wetland 55

Wetland 51

Wetland 5

Wetland 54

Appendix II -- Wetland Monitoring Data for the Cones of Depression

Appendix III -- Hydrological Data

April 18 -- Quarterly Report to the Lower Platte North NRD

July 9 -- Construction Report

July 18 -- Quarterly Report to the Lower Platte North NRD

2006

January 10 -- Quarterly Report to the Lower Platte North NRD

January 10 -- Construction Report, January 2006

January 10 -- Annual Groundwater Monitoring Report

February -- Platte West 404 Permit Conditions, January 2006 Update

March -- Platte West 404 Permit Conditions, March 2006 Update

March 6 -- Threatened and Endangered Species Agreement Update -- Plans and Specifications for Backwater Habitat Project.

March 22 -- 2005 Bathymetric Monitoring Report

March 22 -- 2005 Wetland Monitoring Report

April 10 -- Quarterly Report to the Lower Platte North NRD

April 13 -- Wet Meadow Contingency Plan

May 4 -- Supplemental Report to the Preliminary Final Phase II, Platte West Wellfield Groundwater Modeling Study

July 7 -- Quarterly Report to the Lower Platte North NRD

July 7 -- Construction Report

July 14 -- Supplemental Wetland Delineation Report for Raw Water Pipeline

October 25 -- Quarterly Report to the Lower Platte North NRD

2005

January 3 -- Construction Report

January 5 -- Groundwater Monitoring Report

January 20 -- Groundwater Model Presentation to the Lower Platte North Natural Resources District

February -- Bathymetric Evaluation and Monitoring Ponds within the Cones of Depression

February -- Wetland Delineation Report for the Cone of Depression

May -- Request for Bids to Build the Plant

July 15 -- July 2005 Quarterly Report to Lower Platte North NRD

July 15 -- Construction Report

July Final Monitoring Plans Wetland Monitoring Plan

Bathymetric Monitoring Plan

August -- Procedure -- Processing Claims for Adverse Impacts

August -- Wetland Mitigation Plan for Wetland Impacts -- Phase 1

September 8 -- Wetland Delineation Report for the Raw Water Pipeline

October 14 -- October 2005 Quarterly Report to Lower Platte North NRD

October -- Preliminary Final Phase II Platte West Well Field Groundwater Modeling Study

October 21 -- Sampling and Analysis Plan for Ground Water Monitoring of Wells near the Metropolitan Utilities District's Platte River West Well Field near Wann, Nebraska -- Part I, Field Sampling Plan and Part II, Quality Assurance Project Plan by V.L. McGuire, J.A. Godberson, and R.C. Wilson

December -- Spring/Fall 2005 Analysis Results of Samples from Wells Near the Metropolitan Utilities District's Platte West Wellfield, Saunders County, Nebraska

2004

June 16 -- Final Cultural Resources Plan

July -- Construction Report

November -- Baseline Groundwater Modeling Report prepared by HDR Engineering Inc. -- Chatman & Associates Inc.

  1. Table of Contents and Glossary
  2. Introduction
  3. Study Area Location, Geology and Hydrogeologic Setting
  4. Groundwater Model Construction
  5. Groundwater Model Calibration
  6. Sensitivity Analysis
  7. Groundwater Model Predictive Analysis
  8. Conclusion

November 12 -- Final Wetland Delineation Report for the Finished Water Pipeline

December 4 -- Final Wetland Delineation Report for the Wellfields

December 15 -- M.U.D. Reponse to U.S. Army Corps of Engineers Comments

2003

October 3 -- Final Wetland Delineation Report for the Water Treatment Facility

November 24 -- Final Platte West Pollutant Spill Plan